Alpha · Multi-validator consensus not yet live · Patent Pending

4/4 node endpoints reachable · SIMULATED in staging (no real node contacted)
DEMOProtocol status: record-level verification. Cryptographic consensus checks (BFT rounds, BLS signature validation, anti-replay) are simulated — awaiting validator engine.
ML Forecasting · Linear Regression + Seasonal Decomposition

Shard Load Forecasting

90-day load history analyzed with linear regression and weekly seasonal decomposition to predict resource exhaustion. Widening confidence intervals reflect increasing uncertainty at longer horizons.

6

Shards Monitored

1

Immediate/Urgent

0

High Risk (30d)

3

Stable

shard-01
LOW

us-east · CPX52 · 160 GB

42.1% nowR²=0.735+0.24%/d
shard-02
LOW

eu-west · CPX42 · 80 GB

47.9% nowR²=0.757+0.25%/d
shard-03
LOW

ap-east · CPX42 · 80 GB

61.7% nowR²=0.757+0.27%/d
shard-04
HIGH

us-west · CPX32 · 40 GB

67.5% nowR²=0.779+0.29%/d
shard-05
HIGH

eu-north · CPX32 · 40 GB

81.2% nowR²=0.844+0.30%/d
shard-06
IMMEDIATE

ap-south · CPX22 · 20 GB

87.0% nowR²=0.835+0.30%/d

shard-01 — us-east

Slope: +0.239%/day · Intercept: 25.3 · R²: 0.735

✓ No critical event in 60-day window
10-3011-1411-2812-1312-2801-1201-270%30%60%105%WarningCriticalCapacity

Purple shaded band = 95% confidence interval · Blue = 30-day historical · Purple dashed = 60-day forecast

🗺 Automated Infrastructure Scaling Plan

Generated from 90-day regression analysis · Sorted by urgency · Projected peak-load dates

ShardCurrentGrowth/dPeak DateUrgencyRecommended ActionReason

shard-06

ap-south

87.0%+0.3022026-12-01 (3d)
IMMEDIATE
Add replica shard + upgrade to CPX52Already above critical threshold

shard-04

us-west

67.5%+0.2852026-12-14 (16d)
HIGH
Schedule hardware upgrade (CPU/RAM ×2)Critical load in 16 days

shard-05

eu-north

81.2%+0.2972027-01-04 (37d)
HIGH
Schedule hardware upgrade (CPU/RAM ×2)Critical load in 2 days

shard-03

ap-east

61.7%+0.2652027-01-26 (59d)
LOW
Monitor closely — budget for Q+1 expansionModerate growth rate 0.27%/day

shard-01

us-east

42.1%+0.239> 60 days
LOW
Monitor closely — budget for Q+1 expansionModerate growth rate 0.24%/day

shard-02

eu-west

47.9%+0.248> 60 days
LOW
Monitor closely — budget for Q+1 expansionModerate growth rate 0.25%/day
IMMEDIATE:1 shardHIGH:2 shardsLOW:3 shardsModel: Linear + Seasonal Decomp · Horizon: 60d · CI: 95%
Staging · simulated settlement · not network finality