HCP Alpha
Single-node and simulated settlement · multi-validator consensus not yet live · no measured production throughput

Build on HCP

Programmable infrastructure without a mandatory cryptocurrency.

Smart contracts, decentralized applications and digital assets on deterministic, bounded execution. Applications sponsor capacity, so users never buy gas.

Contract runtime: staging, internally testedConsensus execution: proposedLabs on this page: educational

Why HCP does not need a native cryptocurrency

Resource measurements inside HCP are non-monetary accounting quantities. They cannot be bought, traded, staked or burned.

What do users pay with?

Nothing, by default. The application, enterprise or operator sponsors execution. Users never see gas, credits or conversions.

What funds the infrastructure?

Hosting subscriptions, institutional agreements, contracted services and operators funding their own needs. Not token issuance.

What secures consensus?

Reviewed validator admission across independent failure domains, not stake. Paying for capacity never buys a vote.

Can applications issue assets?

Yes, under their own authorized rules. No application asset can become a mandatory protocol currency.

The problems a mandatory token creates

  • A mandatory coin makes every user a speculator before they can use an application.
  • Fee markets turn congestion into surprise prices. Capacity agreements keep costs predictable.
  • Stake-weighted security lets money buy control. Independent governance does not.
  • Infrastructure costs are real and finite. They can be funded directly, without artificial scarcity.

Seven separated responsibilities

Authority flows down the stack to consensus. The commercial layer sits outside it: it funds capacity in advance and can never write authoritative state.

Outside the authority path

Deterministic contract execution

Role

Runs contract code with fuel metering, memory limits and restricted host functions, producing the same result on every node.

Authority

Computes proposed state changes. Cannot mint assets or reach keys, files or networks.

Never

No wall-clock time, randomness or live external API calls inside authoritative execution.

If it fails

The call reverts atomically. Consumed work is charged; protected balances are untouched.

Base44 is the presentation and management interface only. Authoritative enforcement belongs in the trusted runtime and independently governed nodes.

The complete dApp deployment flow

Fifteen steps from credentials to monitoring, each labelled with what exists today. Choose an environment to see which steps it can run.

12 of 15 steps available. Available now in staging. Test mode only. No real value, no network finality.

  1. 01

    Developer credentials

    Generate keys locally or register scoped API credentials.

    Implemented (staging)Machine API keys, local wallet keys
  2. 02

    Application namespace

    Reserve an application identifier that scopes contracts, grants and receipts.

    Implemented (staging)Execution-layer component registry
  3. 03

    Write or import a contract

    Supported today: WebAssembly core modules with integer-only arithmetic.

    Implemented (staging)Execution-layer upload
  4. 04

    Compile

    Bring your own WebAssembly toolchain. No official HCP toolchain or SDK is published yet.

    Externally dependentDeveloper toolchain
  5. 05

    Inspect permissions and dependencies

    Static gate rejects imports, floats, threads and start functions. Default-deny capability grants.

    Internally testedStatic gate + capability grants
  6. 06

    Estimate resources

    Deterministic fuel instrumentation reports instructions used per call.

    Internally testedFuel instrumenter
  7. 07

    Deploy to sandbox or testnet

    Sandbox deployment works in staging. The four-validator testnet has not been run.

    Implemented (staging)Staging sandbox
  8. 08

    Security and functional tests

    Runtime test suite covers escapes, fuel exhaustion, replay and forged results.

    Internally testedExecution-layer test suite
  9. 09

    Obtain funded capacity

    Bounded, signed capacity grants from an authorized provider.

    ProposedSpecified, not built
  10. 10

    Submit authorized deployment

    The consensus node has no contract deployment operation yet.

    Not implementedRust node
  11. 11

    Validate and finalize deployment

    Requires validators executing contracts inside consensus.

    Not implementedRust node
  12. 12

    Publish the frontend independently

    Host the application anywhere. HCP never hosts it by requirement.

    Externally dependentAny host
  13. 13

    Users interact with the contract

    In staging, execution runs in an isolated browser worker. That is not authoritative execution.

    Implemented (staging)Staging only
  14. 14

    Verifiable execution receipts

    Domain-separated receipt hashes, single-use tickets and public verification.

    Internally testedReceipt verifier
  15. 15

    Monitor usage, versions and security

    Audit events exist. A resource dashboard per grant is specified.

    Implemented (staging)Audit events

No compatibility with Solidity, the EVM or third-party SDKs is claimed. Supported input is WebAssembly core modules that pass the static gate.

Asset lifecycle simulator

One issuer-defined voucher asset with 2-decimal integer precision. Issue, transfer, lock, unlock, redeem, burn and freeze, and watch the conservation invariant after every operation.

Balances by holder
HolderAvailableLocked
Issuer (Harbor Bank)0.000.00
Alice0.000.00
Bob0.000.00
Mallory (attacker)0.000.00

Conservation invariant holds

circulating 0.00 + locked 0.00 = issued 0.00 − retired 0.00

Redemptions processed: none. Retirement is recorded, never erased.

Operation log

  • No operations yet. Submit one or run a scenario.

Educational model in your browser. The consensus node today supports transfers and single-owner asset registration only; issue, lock, redeem and burn are specified, not built. Burning digital units is not destruction of property or discharge of legal obligations.

Resource-allocation laboratory

Six workload classes share one pool. Compare a naive shared queue with isolated queues, minimum reservations, sponsor quotas and fair borrowing of unused capacity.

A key-farming flood sends 400 units of public requests. Capacity: 100 units.

Naive shared queue

Protected + critical: degraded

  • Protected20% · 0.8/4
  • Critical admin20% · 1.2/6
  • Institutional21% · 5.2/25
  • Commercial21% · 6.2/30
  • Public21% · 82.5/400
  • Bulk21% · 4.1/20

Adaptive reservation (HCP design)

Protected + critical: fully served

  • Protected100% · 4/4
  • Critical admin100% · 6/6
  • Institutional100% · 25/25
  • Commercial100% · 30/30
  • Public6% · 25/400

    Sponsor quota reached at cheap admission check (370 units rejected)

  • Bulk50% · 10/20

Deterministic educational model in abstract units. Reservation sets are examples, not recommendations: real reservations come from workload measurement, capacity planning and failure testing. Borrowed capacity is lent per scheduling tick with bounded work units, so it is reclaimed on the next tick. The supplied 10-million-scenario experiment has not been re-run here.

Developer capacity dashboard

The application sponsors a bounded, signed capacity grant. Its users never see credits or gas. Try failures, replays and budget overruns.

Capacity grant

Grant: cg_7f3a91c2 · v1

Provider: Example independent hosting provider

Application: app.harbor-tickets

Scope: contract:harbor.tickets.v1:call, deploy:sandbox

Network: hcp-sandbox-1

Valid until: 2027-01-31T23:59:59Z

Authorization: Ed25519 signature by provider key (illustrative)

Active

Non-transferable. Confers no ownership, minting authority or validator vote. Separate from any refundable account balance.

  • Contract execution consensus-metered1,000,000 instructions left
  • Signature verification consensus-metered60 verifications left
  • Peak memory per call consensus-meteredlimit 16 pages (64 KiB)
  • Persistent state growth consensus-metered80,000 bytes left
  • Host function calls consensus-metered200 calls left
  • Network bandwidth operator-accounted400,000 bytes left
  • Indexing and history queries operator-accounted100 queries left

    Educational model. Unit costs are illustrative, not benchmarks. Capacity grants are specified, not built.

    What keeps working when something fails

    Choose an industry policy profile and a failure. A commercial failure never becomes a universal security or operational failure.

    Scope: Record integrity, consent evidence and credential checks beside EHR / FHIR systems.

    Excluded: Clinical decisions, emergency treatment, a public medical-record ledger.

    Reported status

    Billing unavailable

    Continues: Execution under existing grants, verification, revocation, recovery and data export.

    Pauses: Purchasing new managed capacity.

    Healthcare rule: Clinical care never depends on an HCP subscription. HCP is not in the clinical path.

    Universal, every profile

    No profile or emergency mode can create unauthorized assets, permit double-spending, skip replay protection or declare a transaction final without quorum.

    Each profile defines: authorized actors, credential requirements, data classification, permitted operations, resource allocation, independent approvals, privacy boundaries, offline operation, emergency procedures, recovery authorities, revocation freshness, audit requirements, integration responsibilities, jurisdictional requirements.

    Nine distinct states, never conflated

    1. Application unavailable

      One application is down. Nothing else is affected.

    2. Billing unavailable

      Payments cannot be taken. Pre-authorized grants keep working.

    3. Resource capacity exhausted

      This grant or class is out of capacity. Work is deferred or rejected, never charged twice.

    4. Credential unauthorized

      The signer lacks authority or was revoked. Request rejected.

    5. Policy approval missing

      An independent approver has not signed. Request waits.

    6. External network unavailable

      Upstream connectivity is lost. Local operation follows the profile.

    7. Consensus quorum unavailable

      Fewer than the required validators. Nothing can be finalized.

    8. Local record pending reconciliation

      Evidence captured locally, signed, not final. Reconciled later.

    9. Authoritatively finalized

      Committed by quorum with a verifiable certificate. The only final state.

    Infrastructure break-even model

    What it costs to keep independent infrastructure running, and what has to fund it. Replace every placeholder with real quotes and benchmarks.

    Monthly costs (placeholder assumptions)

    • $
    • $
    • $
    • $
    • $
    • $
    • $
    • $
    • $
    • $
    • $
    • %

    Customers per candidate tier (enter counts)

    Other monthly revenue

    • $
    • $
    • $

    Tiers are modeling candidates, not offered prices. Live pricing is unchanged. No transaction allowances are assigned until runtime benchmarks exist.

    Monthly cost incl. reserve

    $7,332

    Monthly revenue

    $0

    Monthly shortfall

    $7,332

    • $

    Shortfall exceeds the founder cap. Spending must be reduced or funded before anything is added. Nothing is purchased automatically.

    Where this stands before any production release

    5 gates met, 6 specified but not yet verified on a running network, 7 open. Nothing here is released to production.

    • Existing HCP functionality preserved

      Met

      No existing function, page, entity or price was changed by this work.

    • No mandatory native cryptocurrency

      Specified, unverified

      None introduced. Flag: the Rust testnet ledger still has one genesis balance unit that must become issuer-defined assets.

    • No mandatory user credit wallet

      Specified, unverified

      Application sponsorship is the default in the specification.

    • Computational resources bounded

      Specified, unverified

      Fuel and memory limits exist in the staging runtime. Consensus-side metering not built.

    • Billing cannot control consensus

      Specified, unverified

      Specified. Consensus code never calls billing today, because it has no billing path at all.

    • Protected workloads independently funded

      Open

      Requires funded capacity plans and operator agreements.

    • Priority cannot be self-assigned

      Specified, unverified

      Specified; demonstrated in the resource laboratory only.

    • Healthcare emergency stays institution-controlled

      Met

      HCP is never placed in the clinical path in any profile or page.

    • Government and defense within administrative scope

      Met

      Exclusions are stated in every profile and industry page.

    • Unauthorized execution cannot change protected state

      Open

      Requires contract execution inside consensus, then testing.

    • Asset supply invariants hold

      Open

      Model fuzzed in the browser. The node has no issue, lock, redeem or burn operations yet.

    • Independent operators can participate

      Open

      All four testnet validators share one machine and operator.

    • Contract execution is deterministic

      Specified, unverified

      Static gate removes floats, threads and clocks. Cross-node replay not yet run.

    • Resource consumption accurately accounted

      Open

      Needs runtime benchmarks across independent nodes.

    • Existing pricing unchanged without approval

      Met

      Candidate tiers appear only in the economics model.

    • Confidential materials protected

      Met

      No confidential parameters are published.

    • Actual operational costs documented

      Open

      Economics defaults are placeholders until real quotes exist.

    • Independent review and security acceptance

      Open

      Not started.

    Staging · simulated settlement · not network finality